1 |
chlorine demandthe quantity of chlorine absorbed by wastewater (or water) in a given length of time.
|
2 |
chlorine demandChlorine demand is the difference between the amount of chlorine added to water or wastewater and the amount of residual chlorine remaining after a given contact time. Chlorine demand may change with [..]
|
3 |
chlorine demandThe amount of chlorine needed to completely kill bacteria and algae, and to oxidize other pool contaminants. Chlorine Lock
|
4 |
chlorine demandA measure of the amount of chlorine wwhich can be consumed by organic matter and other oxidizable substances in water without a chlorine residual.
|
5 |
chlorine demandA measure of the amount of chlorine which will be consumed by organic matter and other oxidisable substances in a water before a chlorine residual will be found; the difference between the total chlor [..]
|
6 |
chlorine demandthe difference between the amount of chlorine added to water, sewage, or industrial wastes and the amount of residual chlorine remaining at the end of a specific contact period. Compare residual chlor [..]
|
<< chlorination break point | coliform organisms >> |